System Online
Engine v2.4.1 — Feb 25 2026 18:42 UTC
2,847
Material matches today
+312 in last hour
Live
0.0d
Avg. days saved per project
Across 847 active projects
$0.0M
Cost overruns prevented this week
Rolling 7-day window
0.0%
Inspection pass rate — AI specs
vs. 87.2% industry avg
// AI recommendation engine for construction

The math is right
before the first pour.

Engine ingests your spec sheets, site conditions, and procurement history — then surfaces the exact materials, methods, and subcontractors that compress your schedule.

Run Your First Recommendation →
No signup required · Upload a spec sheet
// Interactive Simulation — touch the engine

Select a project type.
Watch the engine reorganize.

// Select project type to run simulation
#01Engine Pick
96
/100
Pacific Steel W8×31
ASTM A992 / AISC 360-16
Supplier
Pacific Steel Supply
Lead Time
6d
Cost Delta
-14.0%
Insp. Pass
99%
#02
78
/100
Atlas W8×31 Grade-A
ASTM A572 Gr.50
Supplier
Atlas Framing
Lead Time
11d
Cost Delta
-6.8%
Insp. Pass
94%
#03
61
/100
Spec Default W8×31
Generic Bid
Supplier
Open Bid
Lead Time
18d
Cost Delta
0%
Insp. Pass
88%
Supplier Reliability Matrix
Live Data
Supplier
Reliability
On-Time %
Defect %
Pacific Steel Supply
94%
97%
1.2%
Midwest Concrete Co.
88%
91%
2.1%
BuildRight Materials
96%
98%
0.8%
Atlas Framing
79%
82%
3.4%
CoreTec Insulation
91%
94%
1.5%
Summit Roofing Sys.
85%
88%
2.7%
Preferred
Approved
Flag
Schedule Compression
Baseline
Optimized
24d
Saved
187d baseline → 163d optimized
Foundation & Sub21d
Structural Steel34d
MEP Rough-in31d
Envelope & Facade39d
Finish & Inspect38d
// Ready to run on your actual project?
Upload a spec sheet.
Get your first recommendation in 90 seconds.
Real material matches
Live supplier reliability
Compliance auto-check
Run Your First Recommendation →
Cost Comparison
Structural Steel — 8" W-Beam
-14.0%
per floor plate
Spec Default
$184,000
Generic Bid
Alt. Quote A
$171,500
Atlas Framing
Engine PickAI
$158,200
Pacific Steel Supply
Engine saves $25,800 per floor plate
Code Compliance
5/7Auto-checked
IBC 1604.3
Structural load path continuity
AUTO
ASTM A615
Grade 60 rebar certification
AUTO
ACI 318-19
Concrete mix design approval
AUTO
!
NFPA 13
Sprinkler system clearances
ASHRAE 90.1
Envelope U-value compliance
AUTO
ICC A117.1
Accessible unit count ratio
AUTO
UL 263
Fire-resistance assembly rating
Risk Flags
3/3 Resolved
highSteel delivery gap
✓ Fixed

Pacific Steel lead time overlaps pour schedule by 4d. Engine re-sequenced to avoid delay.

mediumSub conflict detected
✓ Fixed

Electrical sub (Volta MEP) has 3 concurrent projects in same zip. Recommend Meridian Electric.

lowSpec substitution risk
✓ Fixed

Architect spec calls for discontinued EIFS product. Engine sourced approved equivalent.

// Field results — real projects, real GCs

What happens when the math is right.

MD
Marcus Delgado
VP of Operations
Fortis Construction Group
"Engine flagged a supplier conflict on our Riverside project 11 days before we would have caught it ourselves. That's a $340K delay it killed before it started."
11 days early
Conflict detected
PN
Priya Nambiar
Chief Estimator
Meridian Build Partners
"My estimator used to spend 6 hours building a submittal package. Engine does it in 40 minutes and the inspection pass rate went from 91% to 98.6%. That's not a tool, that's a new hire."
40 min
vs. 6hr manual
RK
Ryan Kowalski
Project Director
Summit Pacific GC
"We had a supplier sub fail inspection on a 22-story job in 2022. Cost us $1.1M and 6 weeks. Engine's compliance check would have caught it in the recommendation phase. We don't touch a spec without it now."
$1.1M
Failure prevented
// You've been operating the engine. Time to run it on your project.

Upload a spec sheet.
Get recommendations in 90 seconds.

2,847
Matches today
14.3d
Avg saved
$2.1M
Overruns stopped
98.6%
Pass rate
No credit card
Upload any spec format
Results in 90 seconds
Used by 400+ GCs
Run Your First Recommendation →
Trusted by
Fortis ConstructionMeridian BuildSummit Pacific GCApex Civil